Move Earth (Action Powers)

From Action
Revision as of 12:26, 25 October 2007 by Starfox (talk | contribs) (New)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ActionT4 logo
Templates for Action

Dig

Basic Action

You can move prodigious amounts of sand, and huge amounts of earth or even stone. Use Toughness as the difficulty, each point of Outcome moves a cubic meter of earth. Construction created this way is unstable and will soon collapse. If the earth is to be worked with any amount of precision, you will work slower. Over a longer period of time, this power does the work of a number of manual laborers equal to your skill roll.